


This is about the last chapter of the demolition. Reinforced concrete, over 30cm deep foundation and parts of the cowshed (Dutch ‘grupstal‘) of which the menure drain (for lack of a better English word) had been filled with rubble from times long past.
The pneumatic demolition hammer and the mini digger did it in a day or three. including digging to the level needed for the new floor.